Air quality measurement, also known as emission measurement, is included in the environmental legislation within the scope of the Regulation on the Control of Industrial Air Pollution and the Regulation on Air Quality Assessment and Management. Measurements are repeated during the environmental permit phase or every 2 years for control purposes.
Air quality measurements should be carried out as monthly monitoring when the masonry material is stored in the open (outside the closed area) and the mass flow rate of the gas discharged from the chimney is exceeded. Modeling may be necessary before measurements. Since monitoring is carried out, the measurement period specified in the legislation usually takes 2 months with monthly analysis results.